  • Korea - Second Yong San Gang Irrigation Project (英语)

    The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a...

    文件类型: 员工评估报告 报告号: 1247 文件日期: 1977年1月31日 披露方式: Disclosed 作者:

  • Korea - Second Yong San Gang Irrigation Project (英语)

    The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a...

    文件类型: 行长备忘录及推荐 报告号: P1977 文件日期: 1977年1月31日 披露方式: Disclosed 作者: