The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a navigation lock; (b) construction of a sea dike; (c) construction of 16 pumping stations to serve the land to be reclaimed and developed; (d) construction of main and secondary canals; (e) reclamation of tidal land through land leveling and construction...