The development objective of Jiji and Mulembwe Hydropower Project for Burundi is to increase the supply of clean and low cost hydropower electricity to Burundi's national grid. This paper requires an additional...
Bhutan expects to double its hydropower capacity over the next decade, which is expected to have significant effects on the economy. Estimates using a Computable General Equilibrium (CGE) model (the business-as-usual...
The development objective of the Khyber Pakhtunkhwa Hydropower and Renewable Energy Development Program Project for Pakistan is to increase hydropower and renewable energy generation and strengthen the...
The development objective of Tina River Hydropower Development Project is to increase the share of renewable energy through hydropower in Solomon Islands. Some of the negative impacts include: (i) impacts...
The development objective of Tina River Hydropower Development Project is to increase the share of renewable energy through hydropower in Solomon Islands. Some of the negative impacts include: (i) impacts...
Настоящая Техническая записка содержит степень технической детализации, которую неспециалисты могут использовать в качестве руководства при рассмотрении гидрологических аспектов проектов строительства...
The development objective of Tina River Hydropower Development Project is to increase the share of renewable energy through hydropower in Solomon Islands. Some of the negative impacts include: (i) impacts...
The development objective of Tina River Hydropower Development Project is to increase the share of renewable energy through hydropower in Solomon Islands. Some of the negative impacts include: (i) impacts...
The growing impact of climate change on the design and operations of dams and the inherent complexity of dam projects (often multi-purpose) require the capacity to adopt increasingly strict global standards...
Bhutan’s risk of overall and external debt distress is assessed as moderate, unchanged from the 2018 DSA. While the mechanical results point to a high risk of overall and external debt distress, with breaches...
Ratings for the Water Sector Capacity Building Advisory Services Project (WCAP) for Pakistan were as follows: outcome was moderately unsatisfactory and Bank performance was moderately satisfactory, and...
Ratings for the Energy Community of South East Europe APL Program for Albania were as follows: outcome and Bank performance was satisfactory, and monitoring and evaluation (M and E) quality was modest...
Ratings for the Pumped Storage Technical Assistance Project for Indonesia were as follows: outcome was moderately unsatisfactory, Bank performance was satisfactory, and monitoring and evaluation (M and...
The development objective of Emergency Power Restoration Project for Malawi is to rehabilitate and increase resilience of the Kapichira hydropower dam and spillways, and transmission and distribution infrastructure...
The objective of the Fourth Tarbela Extension Hydropower Project is to facilitate a sustainable expansion in Pakistan's electricity generation capacity. Some of the negative impacts and mitigation measures...
The development objective of the First Green and Resilient Growth Development Policy Credit for Bhutan is to: (i) strengthen resilient and private sector-led growth through fiscal sustainability and enhanced...