Skip to Main Navigation

文件与报告库

显示 1 - 2 / 2 显示 | 按批显示结果 10 | 20 | 50

下载:
没有找到记录。请改变您的搜索条件再进行搜索。 无法找到所查文件
  • Malawi - Mobilizing Long-Term Finance for Infrastructure (Vol. 2 of 2) : Summary Report (英语)

    Malawi has a large infrastructure gap, which is beyond what the government can afford. Over the period of two decades (1998-2017), the total public investment in Malawi averaged 4.18 percent of GDP per...

    文件类型: 报告 报告号: AUS0002033 文件日期: 2021年2月1日 披露方式: Disclosed 作者: Mwingu,Neema,Ray,Anuradha,Turkewitz,Joel A.,Kruger,Johan,Lee,Haeyoung,Sahai,Dhruva,Mukiibi,Kagaba Paul,Hettinger,Patrick Shawn,Muximpua,Odete Duarte,Mugabi,Josses,Yan,Yi,Sarmiento-Saher,Sebastian Phillip,Mwanza,William Nyambo,Mwafongo,Tamara Juvenile,Kalembo,Miriam Sangallo,Singili,Maryirene Lucas,Warwick,Mara K.,Riddell,Hugh,Toulmin,R. Gregory,Verma,Niraj

  • Malawi - Mobilizing Long-Term Finance for Infrastructure (Vol. 1 of 2) : Full Report (英语)

    Malawi has a large infrastructure gap, which is beyond what the government can afford. Over the period of two decades (1998-2017), the total public investment in Malawi averaged 4.18 percent of GDP per...

    文件类型: 报告 报告号: AUS0002033 文件日期: 2021年2月1日 披露方式: Disclosed 作者: Mwingu,Neema,Ray,Anuradha,Turkewitz,Joel A.,Kruger,Johan,Lee,Haeyoung,Sahai,Dhruva,Mukiibi,Kagaba Paul,Hettinger,Patrick Shawn,Muximpua,Odete Duarte,Mugabi,Josses,Yan,Yi,Sarmiento-Saher,Sebastian Phillip,Mwanza,William Nyambo,Nyirenda,Yalenga Loraine,Mwafongo,Tamara Juvenile,Kalembo,Miriam Sangallo,Singili,Maryirene Lucas,Warwick,Mara K.,Riddell,Hugh,Toulmin,R. Gregory,Verma,Niraj