Skip to Main Navigation

Malawi - Emergency Power Restoration Project (英语)

The development objective of Emergency Power Restoration Project for Malawi is to rehabilitate and increase resilience of the Kapichira hydropower dam and spillways, and transmission and distribution infrastructure damaged by Tropical Storm Ana. This project has two components. 1) The first component, Kapichira Dam Rehabilitation and Strengthening, aims to finance the return to resilient operation of the 129.6 MW Kapichira hydropower plant through...
更多显示

详细

This document is being processed or is not available.