Indonesia - Infrastructure Reconstruction Enabling Program (英语)

The objective of the Infrastructure Reconstruction Enabling Program (IREP) for Indonesia is to support the Bureau of Rehabilitation and Reconstruction for Aceh and Nias (BRR's) strategy for infrastructure reconstruction by providing high quality technical assistance (TA) services in infrastructure program management, planning, design, construction management, quality management and program monitoring. The project consists of the following components: Component 1) will support the mobilization of a highly skilled Infrastructure Program Management (IPM) team deployed within the existing BRR structure to coordinate infrastructure program and its activities at the macro level. Component 2: will finance a technical team to undertake the planning, project preparation, and implementation work for the West Coast logistical area. Component 3: will support mobilization of a technical team to undertake the planning, project preparation, and implementation work for the Nias logistical area. Component 4: will finance a technical consulting team to undertake the formulation, investment planning, design, and project implementation work of strategic infrastructure projects that are at the provincial and or national level, or with local governments not covered by components 2 and 3. Component 5: will strengthen BRR's capacity to put in place the financial management framework required to ensure that it meets all its fiduciary responsibilities with respect to this TA and other BRR investment projects.

详细

  • 文件日期

    2006/06/19

  • 文件类型

    项目评估文件

  • 报告号

    36649

  • 卷号

    1

  • Total Volume(s)

    1

  • 国家

    印度尼西亚,

  • 地区

    东亚与太平洋区,

  • 发布日期

    2007/01/31

  • Disclosure Status

    Disclosed

  • 文件名称

    Indonesia - Infrastructure Reconstruction Enabling Program

  • 关键词

    Quality and Cost Based Selection;project design and implementation;water supply and sanitation;local government capacity building;Environmental Management Plan;reconstruction and development program;Environmental and Social Safeguard;Social and Institutional Analysis;Environmental and Social Impact;Selection Based on Consultant;monitoring and evaluation system;finance and planning;Financial Management System;operations and maintenance;Hazard Risk Management;capacity building program;planning and design;social and environmental;learning by doing;readiness for implementation;Solid Waste Management;water treatment installation;coordination between donor;adverse environmental impact;standard operating procedure;internal audit activities;local public work;local government activity;financial management manual;flood protection work;human resource capacity;detailed engineering design;local environmental authority;financial management specialist;financial management arrangement;built up area;exchange rate;government accounting standard;direct payment procedure;government training center;Exchange Rates;financial management advisory;high quality standard;allocation of fund;local government entity;infrastructure reconstruction;infrastructure planning;Safeguard Policies;safeguard policy;financial statement;construction supervision;infrastructure needs;internal control;indigenous people;Indigenous Peoples;infrastructure support;infrastructure program;support infrastructure;Housing reconstruction;sea defense;infrastructure service;reconstruction activities;investment phase;capital work;project identification;mitigation measure;vulnerable group;operational procedure;affected communities;recovery effort;donor coordination;development partner;Coral Reef;fiduciary responsibility;procurement practice;essential services;safeguard measure;infrastructure work;macro level;contract management;land acquisition;capacity constraint;management capacity;management structure;resource extraction;government staff;professional engineering;basic infrastructure;standard accounting;software application;social tension;construction impact;fuel spill;environmental sustainability;water course;strategic advice;equitable treatment;geographical range;marginal group;community needs;program planning;environmental orientation;environmental challenge;financial accounting;investment planning;social study;social studies;social concern;social aspect;social issue;safeguard specialist;environmental issue;adequate facility;safety measure;service coverage;land title;land claim;tenure right;tenure system;female head;consultation process;ongoing work;transport network;authorized signatory;accounting standards;procurement progress;budget activity;financial source;technical expertise;management letter;disbursement arrangement;application form;construction standard;ineligible expenditures;existing expertise;geographic coverage;environmental condition;coastal area;terrestrial environment;coastal land;coastal inundation;safeguard approach;land right;aerial photography;critical infrastructure;direct contracting;district authority;disaster relief;international community;community priority;housing sector;housing program;sector priorities;physical damage;program monitoring;water tanker;piping network;vacuum trucks;sludge treatment;physical infrastructure;donor support;primary targets;fixed period;institutional competence;transaction cost;emergency reconstruction;monitoring progress;procurement method;sewerage system;international consultant;core objectives;environmental safeguard;international expert;executive board;community mapping;water resource;infrastructure initiative;economic infrastructure;fiduciary requirements;rural transportation infrastructure;high concentration;flood control;early warning;financial system;budget process;construction management;retroactive financing;quality technical;Environmental Assessment;involuntary resettlement;safeguard issue;reconstruction support

下载

完整報告

正式文件版本(可能有签字)