Nigeria - Electricity Transmission Project : Environmental Assessment (Vol. 1 of 4) : Addendum to the ESMP for Netap Package 1, Lot 1 (英语)

The objective of the Electricity Transmission Project is to increase the transfer capacity of the transmission network in Nigeria. Some of the negative impacts and mitigation measures include: construction of storm-water drains from the point of discharge; clearing of all existing drainage channels within the project site; effluents should be collected into impervious collectors at the point of discharge; provision of waste collection bins at appropriate...
更多显示

Document also available in : 英语, 英语, 英语

详细

This document is being processed or is not available.