Ratings of the Energy and Mineral Sector Strengthening Project for Pakistan were as follows: outcome was moderately satisfactory, Bank performance was satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: a flexible TA project design can allow for continuous overarching borrower support when shifting priorities is a constant. This is particularly important for a middle-income country willing to borrow...
更多显示
详细
-
2019/06/21
-
完成执行与成果报告
-
ICR4574
-
1
-
1
-
2019/07/15
-
Disclosed
-
Brazil - Energy and Mineral Sector Strengthening Project
-
Conselho Nacional de Politica Energetica