The project includes: (a) two floating pumping stations, one with a capacity of 69.5 cubic meters per second and the other of 5.3 cubic meters per second and four fixed pumping stations; (b) a system of concrete-lined main and distribution canals; (c) about 46 fixed pumping stations and about 180 semi-mobile pumping stations to supply water to buried pipe distribution networks; (d) portable furrow and sprinkler irrigation equipment, operation and...
更多显示