The objectives of the Morupule B Generation and Transmission Project are to expand domestic power generation capacity that will support sustained economic growth in Botswana; and build institutional capacity for sustainable development of the energy sector. Negative measures include: loss of top soil, ground water pollution due to hydrocarbon spillage, air quality, flora and fauna, and increase in noise pollution during construction. Mitigation measures...
更多显示
详细
-
2009/05/28
-
环境评价
-
E2068
-
12
-
18 (参阅所有文档系列)
-
2009/05/20
-
Disclosed
-
Executive summary of EIA for Morupule mine expansion
-
accidents