The present document is the final report of the task A: it includes the project review and the related recommendations. The executive summary includes: summary of key issues faced by the electricity sector, wave one: fix the basics and prepare for restructuring, and wave two: restructure and prepare for ambition options for wave three (realize ambition).
更多显示