Ratings for the First Transport Project for Poland were as follows: outcomes were highly satisfactory, Bank performance was satisfactory, and the Borrower performance was also satisfactory. Some lessons learned included: creation of the specialized unit for procurement within the railway, headed by someone with international procurement experience, and the retention of that specialist throughout implementation, was an immense help. Continuity of task manager from the preparation phase through implementation yields considerable benefits in terms of the efficiency and consistency of the Bank's role. A broad initial project in a sector can prove valuable in opening the door for subsequent lending operations which then pursue in more detail and in narrower fields the institutional band policy reforms analyzed under the first operation.
详细
-
文件日期
1997/06/13
-
文件类型
完成执行与成果报告
-
报告号
16722
-
卷号
1
-
Total Volume(s)
1
-
国家
-
地区
-
发布日期
2010/06/18
-
Disclosure Status
Disclosed
-
文件名称
Poland - First Transport Project
-
关键词
Maintenance & repair; Modernization; Railways; Road & highway networks; Rolling stock; Railway signaling equipment; Institution building; Management information systems
- 更多显示