Malaysia - Fifth Power Project (英语)

The project consists of the third stage at Tuanku Ja'afar (Port Dickson) Thermal Station and transmission lines and associated substations to deliver the power to the load centers. The third stages at Port Dickson comprises three new units (Units 5 to 7) each of 120 MW and will bring the station to its final total capacity of 600 MW. The civil works for all three units would be carried out together and two of the three 120 MW units (Units 5 and 6) would be in operation in 1974 to meet the conservatively estimated increase in power demand by that time. The third unit would be installed within two years thereafter to meet growth in power demand as it develops. NEB intends to order all three units at once, retaining the option to cancel the third unit should future demand projections show that it will not be needed as soon as presently planned. A new order would then be placed for a third unit to be installed in time to meet the revised load forecast.

详细

  • 文件日期

    1970/06/30

  • 文件类型

    行长备忘录及推荐

  • 报告号

    P848

  • 卷号

    1

  • Total Volume(s)

    1

  • 国家

    马来西亚,

  • 地区

    东亚与太平洋区,

  • 发布日期

    2010/06/24

  • Disclosure Status

    Disclosed

  • 文件名称

    Malaysia - Fifth Power Project

  • 关键词

    average rate of return;expansion of transmission;transmission line;foreign exchange;internal cash generation;accelerated economic growth;per capita gnp;amount of loan;degree of autonomy;debt service payment;power system development;export of goods;total debt service;civil works;local currency expenditure;consumer price index;external public debt;load center;fixed asset;Fixed Assets;Electric Power;project finance;retail trade;land settlement;market price;bank's guidelines;private investment;external borrowing;debt-service ratio;public capital;internal resources;increased investment;merchandise import;commercial bank;federal government;public authority;cash reserve;financial gap;consulting service;Consulting services;Financing plans;load forecast;future demand;bulk power;auxiliary equipment;generating plant;annual tax;construction cost;capital requirement;construction period;international tender;water control;reticulation system;equipment specification;long-term contract;financial controller;hydroelectric scheme;diesel plant;hydroelectric plant;installed capacity;financial rate;urban income;increasing unemployment;oil palm;managerial capacity;tin mine;import substitution;

下载

完整報告

正式文件版本(可能有签字)