Skip to Main Navigation

China - Integrated Economic Development of Small Towns Project : environmental assessment (Vol. 8) : Guangdong creek rehabilitation component under integrated economic development of small towns (汉语)

The objective of the Integrated Economic Development of Small Towns Project for China is to promote sustainable economic development in selected towns of Gansu, Hunan and Guangdong provinces, creating conditions for increased employment, income generation and improved quality of life, by supporting public infrastructure development and strengthening the capacity of related institutions. Negative impacts include: waste water, solid wastes, noise pollution, waste gas, and sludge. Mitigation measures include: 1) oil leaked shall be recycled with buckets, poured into waste oil tanks after being collected with special buckets and hand over waste oil reclamation depot, and waste oil dropped on the earth shall be cleaned with cotton; 2) domestic waste shall be packed with bags, separately collected and be collective cleaned away by the environmental protection department for further disposal; 3) during construction, the operation time of construction equipment shall be properly arranged so as to avoid that lots of equipment with high noise may operated at the same time or at night; 4) safety management shall be conducted; 5) low-noise type of equipment shall be selected; and 6) sludge treatment shall be carry out in a minimization, stabilization and harmless manner, and sludge treatment facilities shall be planned constructed and put into operation at the same time with wastewater disposal facilities.

详细

  • 文件日期

    2011/11/01

  • 文件类型

    环境评价

  • 报告号

    E2930

  • 卷号

    8

  • Total Volume(s)

    14 (参阅所有文档系列)

  • 国家

    中国,

  • 地区

    东亚与太平洋区,

  • 发布日期

    2012/01/17

  • Disclosure Status

    Disclosed

  • 文件名称

    Guangdong creek rehabilitation component under integrated economic development of small towns

  • 关键词

    breed base;construction site;cultural relic;environment management;environment protection;construction period;construction and operation;construction work;environment protection department;environment impact assessment;surface water body;water pollution control;Solid Waste Management;physical cultural resources;surface water flow;contractors and construction;prevention and education;quality and quantity;solid waste treatment;refuse disposal site;noise control measure;domestic solid waste;local government regulation;flora and fauna;loss of water;sectors of society;environmental protection department;air pollution control;adverse weather conditions;water source protection;discharge of wastewater;land administration law;fugitive dust emissions;transportation of materials;waste water;construction area;historic site;ecological environment;construction road;river regulation;access road;project construction;drainage facilities;negative effect;construction material;wild animal;construction camp;speed restriction;dust control;construction time;construction stage;night construction;heavy metal;environment assessment;flow chart;ecosystem restoration;land occupation;sludge management;natural habitat;wind direction;river channel;safety management;wastewater discharge;water quality;water level;water use;clean vehicle;conservation measure;female workers;sanitary facility;domestic waste;natural flow;drainage ditch;low noise;soil resource;inspection item;national rules;sediment deposition;air pollutant;reporting procedure;environment monitoring;preventive measure;epidemic prevention;conservation experts;washing machine;wet season;construction equipment;drainage channel;domestic wastewater;dry season;pipe network;preservation zone;water quantity;public security;cultural site;culture conservation;site protection;biological diversity;native species;safety training;storage area;

下载

完整報告

正式文件版本(可能有签字)