Skip to Main Navigation

Vietnam - Rural Distribution Project : environmental assessment (Vol. 61) : Environmental management plan for the second circuit of Dong Hoi - Ba Don 110kV transmission line (英语)

The development objective of the Rural Distribution Project for Vietnam focuses on rehabilitating and increasing the capacity of existing distribution lines and substations and standardizing them to enable them to meet the growing demand more efficiently, provide better quality and quantity of electric power for productive uses, and reduce power system losses. This environmental assessment (EA) document evaluated impacts, as follows: noise; dust; solid waste disposal; contamination to surface water bodies; project location; maximum number of workers at every construction site; means of transportation of materials, equipment and machinery to the construction sites; temporary and permanent land acquisition; number of affected households; and Vietnamese laws and regulations. As a result of this assessment the EA suggests mitigation measures, including: avoid vegetation clearing as much as possible; forbid use of herbicides and defoliants; cover construction materials with canvas when transported on roads to avoid spillage; water spray at the construction site near residential areas to avoid dust propagation; to avoid noise and vibration utilize machinery at permitted noise level; hold public consultation to give notice of construction in the evening hours; compensate for losses to agricultural production, in accordance with policies of the Bank and Vietnamese laws; inform local authorities and local people of the date and time of electrical generation and danger when power lines are live to avoid unfortunate tragedies; and finally, comply with Vietnam's environmental policy, legislation, institutional, regulatory framework, international agreements relative to the protection of the environment of which Vietnam is a signatory, and compliance with the Bank's environmental, natural habitat areas, and cultural heritages operational safeguards directives.

详细

  • 文件日期

    2010/09/01

  • 文件类型

    环境评价

  • 报告号

    E1712

  • 卷号

    61

  • Total Volume(s)

    71 (参阅所有文档系列)

  • 国家

    越南,

  • 地区

    东亚与太平洋区,

  • 发布日期

    2011/02/25

  • Disclosure Status

    Disclosed

  • 文件名称

    Environmental management plan for the second circuit of Dong Hoi - Ba Don 110kV transmission line

  • 关键词

    transmission line;Project Monitoring;land area;Environmental Management Plan;construction site;surface water resource;environmental management activities;transportation of materials;law and regulation;flora and fauna;trips per day;parties in relation;effect on health;implementation of mitigation;environmental safeguard policy;transmission and distribution;surface water source;high voltage network;number of workers;species of bat;mountain area;residential area;unit price;construction stage;telecommunication line;committee chairman;power network;power line;building material;Natural Resources;noise level;local traffic;soil excavation;public consultation;affected households;electrical safety;rural traffic;waste water;infrastructure work;fruit tree;civil works;fire precaution;urban one;rural area;provincial road;consultation outcomes;living standard;resettlement plan;local regulation;residential land;dry season;power corporation;heavy rain;diesel generator;mitigation measure;optical cable;local economy;geographical position;legal framework;rain water;chemical substance;agricultural land;soil erosion;wet season;Cultural Heritage;natural forest;historical monuments;surface soil;rainy season;worker health;environment assessment;water quality;assessment methodology;environmental reporting;reporting system;internal monitoring;construction work;concerned parties;environmental issue;monitoring activity;short distance;local conflict;land resource;national defense;wild species;rich culture;archaeological site;historical relic;outer wall;social issue;fresh water;social work;reinforced concrete;traffic system;land resources;forestry land;main river;artificial lake;timber tree;construction material;coastal resource;large fish;average rainfall;temporary resettlement;cost production;local electricity;investment cost;access road;vegetation cover;trade center;natural environment;community for use;magnetic field;tropical monsoon;safety procedure;drainage system;traffic load;geographical zone;sandy areas;freight yard;water pump;project construction;alluvial soil;information transmission;circuit breaker;clay soil;mountainous area;construction phase;safety construction;computer system;dust level;cable laying;noise effect;electrical supply;rice field;electric line;biological diversity;land use;plastic bottles;average temperature;traffic area;cultural structure;station location;construction machinery;compensation policy;negative effect;construction engineering;general budget;annex annex;

下载

完整報告

正式文件版本(可能有签字)