详细
-
作者
-
文件日期
2021/10/27
-
文件类型
项目文件
-
报告号
RES48641
-
卷号
1
-
Total Volume(s)
1
-
国家
-
地区
-
发布日期
2021/10/27
-
Disclosure Status
Disclosed
-
文件名称
Disclosable Restructuring Paper - Enhanced Road Access Project - P145545
-
关键词
road safety; road asset management system; run off the road; resilience to climate change; road and bridges; extreme weather event; contract signing; axle load limit; financial management arrangement; Investment Project Financing; single source procurement; main road network; road safety audit; climate resilience; road sector; traffic count; budget constraint; civil works; additional saving; variation order; available funds; construction specification; existing contract; financing instrument; asphalt concrete; road standard; field investigation; vehicle traffic; bridge work; new contract; topographic survey; procurement process; network traffic; bus stop; traffic speed; natural rock; safety barrier; rural area; heavy flood; project risk; high traffic; road access; fourth extension; Safeguard Policies; safeguard policy
- 更多显示