Botswana - Morupule B Generation and Transmission Project : environmental assessment (Vol. 13 of 18) : Executive summary of EIA for water pipeline connecting NSC to Morupule mine (Setswana)

The objectives of the Morupule B Generation and Transmission Project are to expand domestic power generation capacity that will support sustained economic growth in Botswana; and build institutional capacity for sustainable development of the energy sector. Negative measures include: loss of top soil, ground water pollution due to hydrocarbon spillage, air quality, flora and fauna, and increase in noise pollution during construction. Mitigation measures...