The development objective of Emergency Operation for Development Project (EODP) for Iraq is to support the country in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. Some of the negative impacts include : (i) emission of pollutants from engines of construction machinery and equipment; (ii) noise emission from engines of construction machinery and equipment; (iii) soil or subsoil contamination due to accidental spills and leaks from construction equipment; (iv) solid wastes from construction camps or offices; (v) improper disposal of debris or construction wastes on river banks; (vi) pollution of rivers or waterways may negatively affect the aquatic ecosystem; (vii) during rehabilitation, sites or structures of cultural significance may be negatively affected from construction works; (viii) land acquisition or obstructing access to amenities due to construction or rehabilitation activities; (ix) traffic impacts due road blockages for construction purposes and detours; and (x) falling into trenches.
详细
-
作者
-
文件日期
2016/06/01
-
文件类型
环境评价
-
报告号
SFG2247
-
卷号
1
-
Total Volume(s)
1
-
国家
-
地区
-
发布日期
2017/05/22
-
Disclosure Status
Disclosed
-
文件名称
Environmental and social management framework
-
关键词
sanitation, flooding, environmental quality, no, environmental conditions, traffic congestion, economic growth, alluvial plains, bus corridor, birds, environmental degradation, cultural heritage, dams, waterways, vehicles, discharge, range land, habitats, emissions, monitoring, reservoirs, agricultural lands, infrastructure development, noise emission, housing, surface water, transport safety, water table, traffic, erosion control, peak flows, quality, safety regulations, air, winds, public health, stream, traffic management, air pollutants, vehicle, sediment, freshwater habitats, plants, road, costs, air pollution, training, mountains, transport, sediments, basins, floods, plains, construction, mobility, deep water, public safety, biodiversity, species, improper disposal, rainfall, drainage, pollution, indicators, intersections, runoff, classification, crops, aquatic ecosystems, infrastructure, bus, traffic control, emission, congestion, fresh water, marsh, transportation, vegetation, inspection, aquatic life, policies, trucks, resettlement, civil works, freshwater, alluvial plain, environmental impacts, climate, accessibility, forests, fruit, marshes, pollutants, agriculture, highlands, vehicular traffic, speed controls, aesthetics, streets, bridge, roads, hydrological regime, particles, surface area, crossing, erosion, bridge repair, land, uplands, ecosystems, salinity, dry weather, analysis, riverine, residential areas, groundwater, mitigation, accidents, conservation, tunnels, fuel, physiographic zones, soils, conveyance, restoration, air emissions, investments, agreement, pedestrians, culverts, noise, safety, wetlands, implementation, tires, native species, preservation, traffic impacts, river
- 更多显示