The objective of the Additional Financing for Rural Power Project for Philippines is to render better and effective to its consumer members, establishes the 10 MVA power sub-station to primarily solve the problem of power shortage. Negative measures include: loss of vegetation due to land clearing and backfilling, disturbance of wildlife within the influence area due to noise and other construction activities, generation of soil waste, air pollution, increase in the incidence of crime and accidents, erosion from exposed cuts and landslides due to earthmoving and excavation activities, and pollution of nearby water body due to improper disposal of construction wastes. Mitigation measures include: (a) set-up temporary disposal mechanism within the construction area and properly dispose the generated solid wastes; (b) limit land clearing as much as possible; (c) provide temporary fencing to vegetation that will be retained; (d) re-establish or stimulate the habitat of affected wildlife in another suitable area; (e) segregation of recyclable materials; and (f) schedule noise construction activities during day time.
详细
-
作者
T&M Consultancy and Allied Services
-
文件日期
2005/01/14
-
文件类型
环境评价
-
报告号
E1992
-
卷号
4
-
Total Volume(s)
8
-
国家
-
地区
-
发布日期
2008/10/02
-
Disclosure Status
Disclosed
-
文件名称
Certificate of non-coverage for the proposed Colasi Falls Mini-Hydro Project
-
关键词
cC, cs, deed, deeds, deposit, fair market ValUe, id, LAND USE, Loan, LOC, Occupancy, REpAIR, roads, Tax, ZONING
- 更多显示