The objectives of the Morupule B Generation and Transmission Project are to expand domestic power generation capacity that will support sustained economic growth in Botswana; and build institutional capacity for sustainable development of the energy sector. Negative measures include: loss of top soil, ground water pollution due to hydrocarbon spillage, air quality, flora and fauna, and increase in noise pollution during construction. Mitigation measures...
更多显示
详细
-
2007/11/01
-
执董会报告
-
48448
-
1
-
2009/11/11
-
Disclosed
-
Environmental and social impact assessment for Morupule B power station : executive summary
-
power station