Africa - Tanzania-Zambia Transmission Interconnector Project : Resettlement Plan (Vol. 2) : Resettlement Action Plan for Mbeya -Tunduma-Sumbawanga 400kV Power Transmission Line (英语)

The development objective of the Tanzania-Zambia Transmission Interconnector Project for Africa is to establish cross-border transmission capacity between the Southern African power pool and the Eastern Africa power pool to enable regional power trade. Some of the negative impacts include : (i) loss of residential land; (ii) loss of housing and non-residential building assets; (iii) loss of fruit and timber/shade trees and other perennial crops; (iv)...
更多显示

Document also available in : 英语

详细

  • 2022/06/02

  • 移民安置计划

  • SFG4257

  • 2

  • 1

  • EASTERN AND SOUTHERN AFRICA, 非洲,

  • 非洲,

  • 2022/06/10

  • Disclosed

  • Resettlement Action Plan for Mbeya -Tunduma-Sumbawanga 400kV Power Transmission Line