Skip to Main Navigation

Georgia - Transmission Grid Stretching Project : Resettlement Plan (Vol. 5 of 8) : Resettlement action plan for construction of Akhaltsikhe-Batumi 220kv double circuit power transmission line - Segment II – Section III: km 40.8- km 52.6 (English)

The development objectives of the Transmission Grid Strengthening Project for Georgia are to provide reliable power transmission to the southwestern part of the grid, upgrade electricity exchange systems, and provide economically efficient, environmentally, and socially sustainable electricity sector planning. Some of the negative impacts and mitigation measures include: (1) for agricultural lands - cash compensation at full replacement cost at current...
See More

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Villegas,Jorge E..

Georgia - Transmission Grid Stretching Project : Resettlement Plan (Vol. 5 of 8) : Resettlement action plan for construction of Akhaltsikhe-Batumi 220kv double circuit power transmission line - Segment II – Section III: km 40.8- km 52.6 (English). Georgia : Adjaristsqali Georgia LLC ; DG Consulting. http://documents.worldbank.org/curated/en/918641496761913169

This document is being processed or is not available.