Skip to Main Navigation

Africa - Tanzania-Zambia Transmission Interconnector Project : environmental assessment (Vol. 4 of 4) : Updated environmental and social impact assessment study for the 340km Mbeya-Tunduma–Sumbawanga 400kV transmission line and 4km Tunduma substation to Tanzania-Zambia Border 330kV transmission line (English)

The development objective of the Tanzania-Zambia Transmission Interconnector Project for Africa is to establish cross-border transmission capacity between the Southern African Power Pool and the Eastern Africa Power Pool to enable regional power trade. Some of the negative impacts and mitigation measures are includes : (i) prepare and implement erosion and sediment control plans,particularly in areas identified as having high erosion potential; (ii)...
See More

Document also available in : English, English, English, English

DETAILS

  • 2018/04/11

  • Environmental Assessment

  • SFG4014

  • 4

  • 4 (See all volumes)

  • Africa,

  • Africa,

  • 2018/04/11

  • Disclosed

  • Updated environmental and social impact assessment study for the 340km Mbeya-Tunduma–Sumbawanga 400kV transmission line and 4km Tunduma substation to Tanzania-Zambia Border 330kV transmission line

  • transmission line


Citation

Romanova,Ekaterina.

Africa - Tanzania-Zambia Transmission Interconnector Project : environmental assessment (Vol. 4 of 4) : Updated environmental and social impact assessment study for the 340km Mbeya-Tunduma–Sumbawanga 400kV transmission line and 4km Tunduma substation to Tanzania-Zambia Border 330kV transmission line (English). Africa : s.n.. http://documents.worldbank.org/curated/en/517151523471325042

This document is being processed or is not available.