DETAILS
-
2022/03/11
-
Environmental Assessment
-
SFG4014
-
5
-
2022/04/05
-
Disclosed
-
Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line
Citation
Borrowing Agency.
Africa - Tanzania-Zambia Transmission Interconnector Project : environmental assessment (Vol. 5 of 4) : Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line (English). Eastern Africa : Borrowing Agency. http://documents.worldbank.org/curated/en/099035004052265427