Skip to Main Navigation

Africa - Tanzania-Zambia Transmission Interconnector Project : environmental assessment (Vol. 5 of 4) : Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line (English)

The development objective of the Tanzania-Zambia Transmission Interconnector Project for Africa is to establish cross-border transmission capacity between the Southern African Power Pool and the Eastern Africa Power Pool to enable regional power trade. Some of the negative impacts and mitigation measures are includes : (i) prepare and implement erosion and sediment control plans,particularly in areas identified as having high erosion potential; (ii)...
See More

Document also available in : English, English, English, English

DETAILS

  • 2022/03/11

  • Environmental Assessment

  • SFG4014

  • 5

  • 4 (See all volumes)

  • Eastern Africa, Africa,

  • Africa,

  • 2022/04/05

  • Disclosed

  • Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line


Citation

Borrowing Agency.

Africa - Tanzania-Zambia Transmission Interconnector Project : environmental assessment (Vol. 5 of 4) : Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line (English). Eastern Africa : Borrowing Agency. http://documents.worldbank.org/curated/en/099035004052265427

This document is being processed or is not available.