Skip to Main Navigation

文件与报告库

显示 1 - 20 / 405 显示 | 按批显示结果 10 | 20 | 50

下载:
没有找到记录。请改变您的搜索条件再进行搜索。 无法找到所查文件
  • Fiji : Lautoka and Ba Hospitals (英语)

    Redevelopment of Lautoka Hospital and Ba Hospital is the first Public Private Partnership (PPP) to be implemented in Fiji. These upgrades represent a major milestone towards the Government of Fiji’s (GoF)...

    文件类型: 简介 报告号: 185814 文件日期: 2023年10月31日 披露方式: Disclosed 作者: World Bank


  • India : Bengaluru Public Street Lighting (英语)

    Bengaluru is the information technology capital of India, often branded as the country’s Silicon Valley. The city boasts 485,000 street lights but upgrading and maintaining the infrastructure has been...

    文件类型: 简介 报告号: 185818 文件日期: 2022年12月31日 披露方式: Disclosed 作者: World Bank


  • Assessing the Impact of COVID-19 on PPP Pipelines and Projects in Preparation (英语)

    Coronavirus disease 2019 (COVID-19) has impacted infrastructure public-private partnerships (PPP) projects and investments around the globe in all sectors. In its first 18 months, the pandemic caused disruptions...

    文件类型: 报告 报告号: 173031 文件日期: 2022年6月26日 披露方式: Disclosed 作者: Jamieson,Jane,Meco,Lorena,Paul,Christina Jutta,Sy,Jemima T.

  • Assessing Operational PPP Portfolios (英语)

    The Coronavirus disease 2019 (COVID-19) pandemic will continue to impact infrastructure projects around the globe in all sectors as supply chains are disrupted, customer demand falls, and health regulations...

    文件类型: 报告 报告号: 173033 文件日期: 2022年6月26日 披露方式: Disclosed 作者: Jamieson,Jane,Chao,Jenny Jing,Sy,Jemima T.

  • Stocktake of Government Responses to the Impact of COVID-19 on PPP Projects (英语)

    Coronavirus disease 2019 (COVID-19) has impacted infrastructure public-private partnerships (PPP) projects around the globe in all sectors. There were disruptions not only to operational projects, but...

    文件类型: 报告 报告号: 173030 文件日期: 2022年6月26日 披露方式: Disclosed 作者: Jamieson,Jane,Meco,Lorena,Paul,Christina Jutta,Sy,Jemima T.


  • Cleaner Production Case Study : Water Saving Evince Textiles Limited (英语)

    Processing operations in the textile industry consume a lot of water. While the mechanical aspects involving spinning and weaving need little water, the wet processing operations use water extensively...

    文件类型: 简介 报告号: 162059 文件日期: 2021年7月23日 披露方式: Disclosed 作者:


  • Cleaner Production Case Study : Installation of Flow Meters (英语)

    This series showcases success stories of partnership for cleaner textile (PaCT) partner factories in the Bangladesh textile sector that have implemented cleaner production projects.

    文件类型: 简介 报告号: 162055 文件日期: 2021年7月23日 披露方式: Disclosed 作者: Chowdhury,Nishat Shahid

  • Cleaner Production Case Study : Electrical Efficiency (英语)

    This series provides examples of partnership for cleaner textile (PaCT’s) advisory work with clients to implement cleaner production solutions in the Bangladesh textile wet processing sector.

    文件类型: 简介 报告号: 162053 文件日期: 2021年7月23日 披露方式: Disclosed 作者: Chowdhury,Nishat Shahid

  • Cleaner Production Case Study : Automatic Blowdown Control System (英语)

    If water in a boiler contains high concentrations of dissolved solids, it carries over through the steam produced, which can lead to foaming. This leads to a phenomenon called water hammer, which damages...

    文件类型: 简介 报告号: 162052 文件日期: 2021年7月23日 披露方式: Disclosed 作者:

  • Cleaner Production Case Study : Thermal Efficiency (英语)

    Most thermal energy wastage stems from lack of awareness amongst workers and managers, and inadequate upkeep of plants, machinery and auxiliary systems. Lack of monitoring interferes with the estimation...

    文件类型: 简介 报告号: 162065 文件日期: 2021年7月23日 披露方式: Disclosed 作者:




  • Cleaner Production Case Study : Upgrading Process Machinery (英语)

    Textile processing is notorious for its energy and water intensity, consumption of a large variety of toxic chemicals, and for its high pollution load, This consequently raises the cost of resources and...

    文件类型: 简介 报告号: 162066 文件日期: 2021年7月23日 披露方式: Disclosed 作者: