文件与报告库

搜索/浏览文档


  

完善由:

具体日期范围

更多显示
更多显示
更多显示
  • 显示9699个结果中的第1 - 20个
  • 按批显示结果
  • 10
  • 20
  • 50
下载到Excel [x]
Nigeria - Erosion and Watershed Management Project : environmental assessment (Vol. 5 of 6) : Environmental and Social Management Plan (ESMP) for Second Nyangasang Gully erosion site in Calabar, Cross River State (英文)

The objective of the Erosion and Watershed Management Project for Nigeria is to restore degraded lands and reduce longer-term erosion vulnerability in targeted areas. ... 更多显示

环境评价 E2924 2014年8月21日

Vietnam - Preparation Technical Assistance (TA) Facility Project : procurement plan (英文)

采购计划 89960 2014年8月12日

Vanuatu - Rural Electrification Project (英文)

安全保障综合数据资料 90028 2014年8月12日

Vietnam - Irrigated Agriculture Improvement Project : procurement plan for Thanh Hoa province (英文)

采购计划 89894 2014年8月6日

Nepal - SREP-Supported Extended Biogas Project (英文)

The SREP- Supported Extended Biogas Project development objective is to promote large off-grid biogas energy generation in Nepal. SREP seeks to deliver two primary categories of benefits from the use of its financial support: (i) increased access to renewable energy and (ii) increased production of renewable energy. ... 更多显示

项目评估文件 PAD762 2014年8月1日

Sierra Leone - Bumbuna Hydroelectric Environmental and Social Management Project (英文)

Ratings for the Bumbuna Hydroelectric Environmental and Social Management Project for Sierra Leone were as follows: outcomes were moderately unsatisfactory, the risk to development outcome was high, the Bank performance was moderately unsatisfactory, and the Borrower performance was also moderately unsatisfactory. ... 更多显示

完成执行与成果报告 ICR2972 2014年7月30日

Rwanda - Sustainable Energy Development Project (英文)

Ratings for the Sustainable Energy Development Project for Rwanda were as follows: outcomes were satisfactory, the risk to global environment outcome was moderate, the Bank performance was satisfactory, and the Borrower performance was also satisfactory. ... 更多显示

完成执行与成果报告 ICR3092 2014年7月30日

Vanuatu - Rural Electrification Project (英文)

项目信息文件 80541 2014年7月24日

Egypt - Household Natural Gas Connection Project : chair summary (英文)

董事会纪要 89740 2014年7月24日

Lebanon - Municipal Services Emergency Project : environmental assessment (Vol. 2 of 2) : Environmental and social management framework : executive summary (阿拉伯语)

The development objective of the Municipal Services Emergency Project for Lebanon is to address urgent community priorities in select municipal services, targeting areas most affected by the influx of Syrian refugees. ... 更多显示

环境评价 E4557 2014年7月23日

Central Asia and South Asia - 1000 Electricity Transmission and Trade Project : request for inspection (英文)

The development objective of the 1000 Electricity Transmission and Trade Project is to create the conditions for sustainable electricity trade between the Central Asian countries of Tajikistan and Kyrgyz Republic and the South Asian countries of Afghanistan and Pakistan. ... 更多显示

独立监察小组注册通知书 89541 2014年7月15日

Vietnam - Transmission Efficiency Project (英文)

The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. ... 更多显示

项目评估文件 PAD766 2014年7月14日

China - Shanxi Coal-bed Methane Utilization Project : procurement plan (中文,英文)

采购计划 89428 2014年7月10日

How regional integration and transnational energy networks have boosted FDI in Turkey (and may cease to do so): a case study: how geo-political alliances and regional networks matter (英文)

Turkey has historically struggled to attract foreign investors. This paper argues that not only macroeconomic and political stability, but also regional integration explains the upsurge in foreign direct investment observed since 2005. ... 更多显示

政策研究报告 WPS6970 2014年7月1日

Sanchez Martin, Miguel Eduardo; Escribano Frances, Gonzalo; de Arce Borda, Rafael

Optimal transition from coal to gas and renewable power under capacity constraints and adjustment costs (英文)

This paper studies the optimal transition from existing coal power plants to gas and renewable power under a carbon budget. It solves a model of polluting, exhaustible resources with capacity constraints and adjustment costs (to build coal, gas, and renewable power plants). ... 更多显示

政策研究报告 WPS6985 2014年7月1日

Lecuyer, Oskar; Vogt-Schilb, Adrien

Kenya - Petroleum Technical Assistance Project : terms of reference for strategic environmental and social assessment for the oil and gas sector (英文)

The development objective of the Petroleum Technical Assistance Project for Kenya is to strengthen the capacity of the Government of Kenya (GoK) to manage its petroleum sector and wealth for sustainable development impacts. ... 更多显示

环境评价 E4560 2014年7月1日

ASTAE : annual status report FY13 (英文)

Fiscal Year 2013 was the second year of the four-year FY2012-2015 Business Plan for the Multi-Donor Trust Fund (MDTF), which now exceeds US$24 million. ... 更多显示

工作文件 89494 2014年7月1日

标题 文件日期 报告编号 文件类型 其他文种
Nigeria - Erosion and Watershed Management Project : environmental assessment (Vol. 5 of 6) : Environmental and Social Management Plan (ESMP) for Second Nyangasang Gully erosion site in Calabar, Cross River State (英文)
更多显示
2014年8月21日 E2924 环境评价
Vietnam - Preparation Technical Assistance (TA) Facility Project : procurement plan (英文)
更多显示
2014年8月12日 89960 采购计划
Vanuatu - Rural Electrification Project (英文)
更多显示
2014年8月12日 90028 安全保障综合数据资料
Vietnam - Second Phase of the Northern Mountains Poverty Reduction Project : procurement plan : Viet Nam - Giai Doan Thu Hai Cua Du an Giam Ngheo Mien Nui Phia Bac (越语)
更多显示
2014年8月7日 89874 采购计划
Vietnam - Irrigated Agriculture Improvement Project : procurement plan for Thanh Hoa province (英文)
更多显示
2014年8月6日 89894 采购计划
Nepal - SREP-Supported Extended Biogas Project (英文)
更多显示
2014年8月1日 PAD762 项目评估文件
Sierra Leone - Bumbuna Hydroelectric Environmental and Social Management Project (英文)
更多显示
2014年7月30日 ICR2972 完成执行与成果报告
Rwanda - Sustainable Energy Development Project (英文)
更多显示
2014年7月30日 ICR3092 完成执行与成果报告
Vanuatu - Rural Electrification Project (英文)
更多显示
2014年7月24日 80541 项目信息文件
Egypt - Household Natural Gas Connection Project : chair summary (英文)
更多显示
2014年7月24日 89740 董事会纪要
Lebanon - Municipal Services Emergency Project : environmental assessment (Vol. 2 of 2) : Environmental and social management framework : executive summary (阿拉伯语)
更多显示
2014年7月23日 E4557 环境评价
Ukraine - Advisory Services and Technical Assistance to NJSC Naftogaz of Ukraine and the Government of Ukraine on the Reform of the Natural Gas Sector Project (英文)
更多显示
2014年7月15日 89642 安全保障综合数据资料
Ukraine - Advisory Services and Technical Assistance to NJSC Naftogaz of Ukraine and the Government of Ukraine on the Reform of the Natural Gas Sector Project (英文)
更多显示
2014年7月15日 89643 项目信息文件
Central Asia and South Asia - 1000 Electricity Transmission and Trade Project : request for inspection (英文)
更多显示
2014年7月15日 89541 独立监察小组注册通知书
Vietnam - Transmission Efficiency Project (英文)
更多显示
2014年7月14日 PAD766 项目评估文件
China - Shanxi Coal-bed Methane Utilization Project : procurement plan (中文,英文)
更多显示
2014年7月10日 89428 采购计划
How regional integration and transnational energy networks have boosted FDI in Turkey (and may cease to do so): a case study: how geo-political alliances and regional networks matter (英文)
更多显示
2014年7月1日 WPS6970 政策研究报告
Optimal transition from coal to gas and renewable power under capacity constraints and adjustment costs (英文)
更多显示
2014年7月1日 WPS6985 政策研究报告
Kenya - Petroleum Technical Assistance Project : terms of reference for strategic environmental and social assessment for the oil and gas sector (英文)
更多显示
2014年7月1日 E4560 环境评价
ASTAE : annual status report FY13 (英文)
更多显示
2014年7月1日 89494 工作文件