文件与报告库

搜索/浏览文档


  

完善由:

具体日期范围

更多显示
更多显示
更多显示
  • 显示18976个结果中的第1 - 20个
  • 按批显示结果
  • 10
  • 20
  • 50
下载到Excel [x]
Statement by Ms. Marie-Gabrielle Ineichen-Fleisch at the 89th meeting of the Development Committee held on April 12, 2014 (英文)

This is a statement by Ms. Marie-Gabrielle Ineichen-Fleisch, State Secretary for Economic Affairs, Swiss Confederation at the eighty-ninth meeting of the Development Committee held on April 12, 2014. ... 更多显示

执董会报告 86983 2014年4月12日

Ineichen-Fleisch, Marie-Gabrielle

Tanzania - Partial Risk Guarantees in Energy Sector Project : Environmental Assessment (英文)

环境评价 E4523 2014年4月7日

Guinea-Bissau - Emergency Water and Electricity Services Upgrading Project : environmental assessment : Environmental and Social Screening and Assessment Framework (ESSAF) (英文)

The objective of the Emergency Water and Electricity Services Upgrading Project is: (i) to restore and increase the access of the population of Bissau to safe water and to improve the quality of water services; and (ii) to improve the reliability of electricity supply to the population of Bissau. ... 更多显示

环境评价 E4519 2014年4月3日

Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (英文)

A 2013 scientific assessment of black carbon emissions and impacts found that black carbon is second to carbon dioxide in terms of its climate forcing. ... 更多显示

工作文件 86485 2014年4月2日

Minjares, Ray; Wagner, David Vance; Baral, Anil; Chambliss, Sarah; Galarza, Sebastian; Posada, Francisco; Sharpe, Ben; Wu, Grace; Blumberg, Kate; Kamakate, Fanta; Lloyd, Alan; Kojima, Masami; Hamilton, Kirk; Johnson, Todd; Kopp, Andreas; Hosier, Richard; Akbar, Sameer

Pakistan - Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project : environmental assessment (英文)

The objective of the Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project for Pakistan is to enable the population along the project corridor to benefit from year round improved access and mobility through reconstruction of priority damaged roads and bridges in the conflict hit areas. ... 更多显示

环境评价 E4526 2014年4月2日

Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment for up-grading of Duga-airport road located in Tanga city (英文)

The development objective of the Additional Financing for the Strategic Cities Project for Tanzania is to improve the quality of and access to basic urban services in seven elected participating local government authorities (LGAs). ... 更多显示

环境评价 E4516 2014年4月1日

Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment for up-grading of Unga limited to Muriet road and Burka bridge located in Arusha city (英文)

The development objective of the Additional Financing for the Strategic Cities Project for Tanzania is to improve the quality of and access to basic urban services in seven elected participating local government authorities (LGAs). ... 更多显示

环境评价 E4516 2014年4月1日

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 1 of 3) : Environmental management plan for rehabilitation of Charentsavan-3 substation (英文)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... 更多显示

环境评价 E4525 2014年4月1日

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 2 of 3) : Environmental management plan for rehabilitation and expansion of Haghtanak substation (英文)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... 更多显示

环境评价 E4525 2014年4月1日

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 3 of 3) : Environmental management plan for rehabilitation of Vanadzor-1 substation (英文)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... 更多显示

环境评价 E4525 2014年4月1日

Saint Vincent the Grenadines - Additional Financing for the Regional Disaster Vulnerability Reduction Project : environmental management framework (英文)

The development objective of the Additional Financing for the Regional Disaster Vulnerability Reduction Project for Saint Vincent the Grenadines is to measurably reduce vulnerability to natural hazards and climate change impacts and to create some level of resilience at a national level. ... 更多显示

环境评价 E4433 2014年4月1日

Transport for health : the global burden of disease from motorized road transport (英文)

This report summarizes the findings of a long and meticulous journey of data gathering and analysis to quantify the health losses from road deaths and injuries worldwide, as part of the path-finding Global Burden of Disease (GBD) study. ... 更多显示

出版 86304 2014年3月31日

Bhalla, Kavi; Shotten, Marc; Cohen, Aaron; Brauer, Michael; Shahraz, Saeid; Burnett, Richard; Leach-Kemon, Katherine; Freedman, Greg; Murray, Christopher J. L.

Cameroon - Environmental and Social Capacity Building for the Energy Sector Project (英文)

Ratings for the Environmental and Social Capacity Building for the Energy Sector Project for Cameroon were as follows: outcomes were moderately unsatisfactory, the risk to development outcome was moderate, the Bank performance was moderately unsatisfactory, and the Borrower performance was also moderately unsatisfactory. ... 更多显示

完成执行与成果报告 ICR2285 2014年3月31日

Guyana - Secondary Education Improvement Project : environmental assessment and management plan (英文)

The objective of the Guyana Secondary Education Improvement Project is to increase the 11th grade survival rate and the number of students that complete secondary education in Guyana's regions 3 and 4 (including Georgetown), by constructing and equipping schools, training teachers, and distributing learning materials. ... 更多显示

环境评价 E4480 2014年3月31日

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (英文)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... 更多显示

环境评价 E4390 2014年3月28日

格鲁吉亚语

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (格鲁吉亚语)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... 更多显示

环境评价 E4390 2014年3月28日

英文,

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment : annexes (英文)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... 更多显示

环境评价 E4390 2014年3月28日

格鲁吉亚语

Argentina - Second Adaptable Program Loan (APL) for the National Highway Asset Management Project (英文)

The overall outcome of the Second Adaptable Program Loan (APL) for the National Highway Asset Management Project for Argentina was rated moderately satifactory. ... 更多显示

完成执行与成果报告 ICR3032 2014年3月28日

标题 文件日期 报告编号 文件类型 其他文种
Statement by Ms. Marie-Gabrielle Ineichen-Fleisch at the 89th meeting of the Development Committee held on April 12, 2014 (英文)
更多显示
2014年4月12日 86983 执董会报告
Kyrgyz Republic - Grant for Pasture and Livestock Management Improvement Project : Environmental assessment (Vol. 3 of 6) : minutes of the Chui province western districts roundtable discussion (英文)
更多显示
2014年4月11日 E4534 环境评价
Tanzania - Partial Risk Guarantees in Energy Sector Project : Environmental Assessment (英文)
更多显示
2014年4月7日 E4523 环境评价
Tunisia - Additional Financing for the Urban Water Supply Project : environmental assessment : Tunisie - Supplementaire de financement pour le projet d'approvisionnement en eau urbain : evaluation environnementale (法语)
更多显示
2014年4月4日 E4521 环境评价
Guinea-Bissau - Emergency Water and Electricity Services Upgrading Project : environmental assessment : Environmental and Social Screening and Assessment Framework (ESSAF) (英文)
更多显示
2014年4月3日 E4519 环境评价
Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (英文)
更多显示
2014年4月2日 86485 工作文件
Pakistan - Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project : environmental assessment (英文)
更多显示
2014年4月2日 E4526 环境评价
Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment for up-grading of Duga-airport road located in Tanga city (英文)
更多显示
2014年4月1日 E4516 环境评价
Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment for up-grading of Unga limited to Muriet road and Burka bridge located in Arusha city (英文)
更多显示
2014年4月1日 E4516 环境评价
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 1 of 3) : Environmental management plan for rehabilitation of Charentsavan-3 substation (英文)
更多显示
2014年4月1日 E4525 环境评价
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 2 of 3) : Environmental management plan for rehabilitation and expansion of Haghtanak substation (英文)
更多显示
2014年4月1日 E4525 环境评价
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 3 of 3) : Environmental management plan for rehabilitation of Vanadzor-1 substation (英文)
更多显示
2014年4月1日 E4525 环境评价
Saint Vincent the Grenadines - Additional Financing for the Regional Disaster Vulnerability Reduction Project : environmental management framework (英文)
更多显示
2014年4月1日 E4433 环境评价
Transport for health : the global burden of disease from motorized road transport (英文)
更多显示
2014年3月31日 86304 出版
Cameroon - Environmental and Social Capacity Building for the Energy Sector Project (英文)
更多显示
2014年3月31日 ICR2285 完成执行与成果报告
Guyana - Secondary Education Improvement Project : environmental assessment and management plan (英文)
更多显示
2014年3月31日 E4480 环境评价
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (英文)
更多显示
2014年3月28日 E4390 环境评价 格鲁吉亚语
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (格鲁吉亚语)
更多显示
2014年3月28日 E4390 环境评价 英文,
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment : annexes (英文)
更多显示
2014年3月28日 E4390 环境评价 格鲁吉亚语
Argentina - Second Adaptable Program Loan (APL) for the National Highway Asset Management Project (英文)
更多显示
2014年3月28日 ICR3032 完成执行与成果报告