文件与报告库

搜索/浏览文档


  

完善由:

具体日期范围

更多显示
更多显示
更多显示
  • 显示31697个结果中的第1 - 20个
  • 按批显示结果
  • 10
  • 20
  • 50
下载到Excel [x]
China - Shanxi Coal Bed Methane Development and Utilization Project : restructuring (英文)

The objective of the Shanxi Coal Bed Methane Development and Utilization Project for China is to assist Shanxi Province in increasing the production and utilization of CBM/CMM to replace coal as a fuel for thermal use and to reduce GHGs and local air pollutants associated with coal combustion. ... æ›´å¤šæ˜¾ç¤º

项目文件 RES22208 2016年2月9日

Peng,Ximing

India - Himachal Pradesh Horticulture Development Project : environmental assessment : Environmental and social management framework (英文)

The objective of the Himachal Pradesh Horticulture Development Project for India is to increase the productivity, profitability and market access of selected horticulture commodities in Himachal Pradesh. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1759 2016年2月3日

Pathy,Manivannan

Indonesia - National Urban Slum Upgrading Program Project : indigenous peoples plan : Environmental and social management framework : draft for review (英文)

The objective of the National Urban Slum Upgrading Program Project is to improve access to basic urban services in targeted slums in Indonesia. ... æ›´å¤šæ˜¾ç¤º

土著居民计划 SFG1748 2016年2月3日

Sari,Kumala

Indonesia - National Urban Slum Upgrading Program Project : environmental assessment : Environmental and social management framework (英文)

The objective is to improve access to basic urban services in targeted slums in Indonesia. Some of the negative impacts and mitigation measures include: limit earth moving to dry periods; protection of most susceptible soil surfaces with mulch; protection of drainage channels with berms, or fabric barriers/geo-textile; installation of sedimentation basins, seeding or planting of erodible surfaces as soon as possible; selection an alignment that reduces environmental disturbances; undertaking maintenance and repairs in a timely fashion; changing the alignment to reduce steep grades when possible; building civil works to stabilize side slopes, terracing or retaining wall installation; using vegetative treatments to stabilize side slopes or prevent erosion; using special treatments to overcome ground water problems, such as drains; regular monitoring and inventory of risks for erosion; conduct solid waste segregation to separate the organic and inorganic waste; contain the leachate in cemented bundling floor and channeled to settling tank before discharged; and cover organic waste for faster composting and prevent odor. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1747 2016年2月3日

Sari,Kumala

Cameroon - Flood Emergency Project : procurement plan : Cameroun - Projet d’Urgence de lutte contre les Inondations : plan de passation (法语)

采购计划 103116 2016年2月2日

South Africa economic update : promoting faster growth and poverty alleviation through competition (英文)

Promoting faster growth and poverty alleviation through competition is particularly important for South Africa, which is facing weak economic growth and limited fiscal resources and has to look to avenues outside the fiscal space to stimulate faster sustainable growth and progress towards its ultimate goal of eliminating poverty, outlined in the 2030 National Development Plan (NDP). ... æ›´å¤šæ˜¾ç¤º

工作文件(编号系列) 103057 2016年2月1日

Purfield,Catriona Mary; Hanusch,Marek; Algu,Yashvir; Begazo Gomez,Tania Priscilla; Martinez Licetti,Martha; Nyman,Sara

Zimbabwe Economic Update - Changing growth patterns : improving health outcomes (英文)

Low export prices and high production costs are contributing to a persistent deficit in the external accounts. Despite narrowing somewhat in recent years, Zimbabwe’s current account deficit remains much larger than those of comparable countries in the region, and exports currently amount to just over half of imports. ... æ›´å¤šæ˜¾ç¤º

工作文件 103601 2016年2月1日

Herderschee,Johannes

Kyrgyz Republic - Agricultural sector risk assessment (英文)

Agriculture is among the most risk-prone sectors in the economies of Central Asia. Production shocks from weather, pests and diseases and adverse movements in agricultural product and input prices not only impact farmers and agri-business firms, but can also strain government finances. ... æ›´å¤šæ˜¾ç¤º

工作文件 103078 2016年2月1日

Broka,Sandra; Giertz, Åsa; Christensen,Garry N.; Hanif,Charity Worsham; Rasmussen,Debra L.; Rubaiza,Rhoda

Tajikistan - Agricultural sector risk assessment (英文)

Agriculture is among the most risk-prone sectors in the economies of Central Asia. Production shocks from weather, pests and diseases and adverse movements in agricultural product and input prices not only impact farmers and agri-business firms, but can also strain government finances. ... æ›´å¤šæ˜¾ç¤º

工作文件 103077 2016年2月1日

Broka,Sandra; Giertz, Åsa; Christensen,Garry N.; Hanif,Charity Worsham; Rasmussen,Debra L.

Sri Lanka - Ending poverty and promoting shared prosperity : a systematic country diagnostic (英文)

Sri Lanka is in many respects a development success story. With economic growth averaging more than 7 percent a year over the past five years on top of an average growth of 6 percent the preceding five years, Sri Lanka has made notable strides towards the goals of ending extreme poverty and promoting shared prosperity (the ‘twin goals’). ... æ›´å¤šæ˜¾ç¤º

Systematic Country Diagnostic 103246 2016年2月1日

India - National Ganga River Basin Project : environmental assessment (Vol. 13) : Environment and social management plan for sewerage and STP scheme in Halisahar town, West Bengal (英文)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1690 2016年2月1日

Singh,Sunita

India - National Ganga River Basin Project : environmental assessment (Vol. 12) : Environmental and social assessment with management plan for sewerage works of Muni Ki Reti - Dhalwala (英文)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1690 2016年2月1日

Singh,Sunita

India - National Ganga River Basin Project : environmental assessment (Vol. 11) : Environmental and social assessment and management plan for development of sewerage system in Barrackpore municipality under NGRBA (英文)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1690 2016年2月1日

Singh,Sunita

Uganda - Second Kampala Institutional and Infrastructure Development Project : resettlement plan : Resettlement action plan : narrative section (英文)

The objective of the Second Kampala Institutional and Infrastructure Development Project for Uganda is to deepen the institutional reforms and enhance city infrastructure to improve urban mobility and foster economic development. ... æ›´å¤šæ˜¾ç¤º

移民安置计划 SFG1745 2016年2月1日

Byansansa,Annette Nabisere

India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 9) : Environmental and social assessment with management plan for Anupshahar sewerage scheme (Distt Bulandshahar) (英文)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1690 2016年2月1日

Singh,Sunita

Nigeria - Erosion and Watershed Management Project : environmental assessment (Vol. 7) : Final report of environmental and social management plan for the Umueshi gully erosion site, Ideato South, Imo state (英文)

The objective of the Erosion and Watershed Management Project for Nigeria is to reduce vulnerability to soil erosion in targeted sub-watersheds. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1692 2016年2月1日

Olatunji,Iretomiwa

India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 8) : Environmental and social assessment with management plan for sewerage works in sewerage district ‘C’ of Allahabad City, Uttar Pradesh (英文)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1690 2016年2月1日

Singh,Sunita

India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 7) : Environmental and social assessment with management plan for sewerage works in Sewerage District of Allahabad City, Uttar Pradesh (英文)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1690 2016年2月1日

Singh,Sunita

Uganda - Second Phase of the Kampala Infrastructure and Institutional Development Project : environmental and social impact assessment (英文)

The development objective of the Second Phase of the Kampala Infrastructure and Institutional Development Project for Uganda is enhanced infrastructure and institutional capacity of Kampala Capital City Authority (KCCA) to improve urban mobility in Kampala. ... æ›´å¤šæ˜¾ç¤º

环境评价 SFG1757 2016年2月1日

Byansansa,Annette Nabisere

标题 文件日期 报告编号 文件类型 其他文种
Lao People’s Democratic Republic - Second Phase of Lao Environment and Social Project (LENS2) : Implementation support mission - May 4 to 27, 2015 (英文)
更多显示
2016年6月30日 102665 备忘录
China - Shanxi Coal Bed Methane Development and Utilization Project : restructuring (英文)
更多显示
2016年2月9日 RES22208 项目文件
India - Himachal Pradesh Horticulture Development Project : environmental assessment : Environmental and social management framework (英文)
更多显示
2016年2月3日 SFG1759 环境评价
Indonesia - National Urban Slum Upgrading Program Project : indigenous peoples plan : Environmental and social management framework : draft for review (英文)
更多显示
2016年2月3日 SFG1748 土著居民计划
Indonesia - National Urban Slum Upgrading Program Project : environmental assessment : Environmental and social management framework (英文)
更多显示
2016年2月3日 SFG1747 环境评价
Cameroon - Flood Emergency Project : procurement plan : Cameroun - Projet d’Urgence de lutte contre les Inondations : plan de passation (法语)
更多显示
2016年2月2日 103116 采购计划
South Africa economic update : promoting faster growth and poverty alleviation through competition (英文)
更多显示
2016年2月1日 103057 工作文件(编号系列)
Zimbabwe Economic Update - Changing growth patterns : improving health outcomes (英文)
更多显示
2016年2月1日 103601 工作文件
Kyrgyz Republic - Agricultural sector risk assessment (英文)
更多显示
2016年2月1日 103078 工作文件
Tajikistan - Agricultural sector risk assessment (英文)
更多显示
2016年2月1日 103077 工作文件
Sri Lanka - Ending poverty and promoting shared prosperity : a systematic country diagnostic (英文)
更多显示
2016年2月1日 103246 Systematic Country Diagnostic
India - National Ganga River Basin Project : environmental assessment (Vol. 13) : Environment and social management plan for sewerage and STP scheme in Halisahar town, West Bengal (英文)
更多显示
2016年2月1日 SFG1690 环境评价
India - National Ganga River Basin Project : environmental assessment (Vol. 12) : Environmental and social assessment with management plan for sewerage works of Muni Ki Reti - Dhalwala (英文)
更多显示
2016年2月1日 SFG1690 环境评价
India - National Ganga River Basin Project : environmental assessment (Vol. 11) : Environmental and social assessment and management plan for development of sewerage system in Barrackpore municipality under NGRBA (英文)
更多显示
2016年2月1日 SFG1690 环境评价
Uganda - Second Kampala Institutional and Infrastructure Development Project : resettlement plan : Resettlement action plan : narrative section (英文)
更多显示
2016年2月1日 SFG1745 移民安置计划
India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 9) : Environmental and social assessment with management plan for Anupshahar sewerage scheme (Distt Bulandshahar) (英文)
更多显示
2016年2月1日 SFG1690 环境评价
Nigeria - Erosion and Watershed Management Project : environmental assessment (Vol. 7) : Final report of environmental and social management plan for the Umueshi gully erosion site, Ideato South, Imo state (英文)
更多显示
2016年2月1日 SFG1692 环境评价
India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 8) : Environmental and social assessment with management plan for sewerage works in sewerage district ‘C’ of Allahabad City, Uttar Pradesh (英文)
更多显示
2016年2月1日 SFG1690 环境评价
India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 7) : Environmental and social assessment with management plan for sewerage works in Sewerage District of Allahabad City, Uttar Pradesh (英文)
更多显示
2016年2月1日 SFG1690 环境评价
Uganda - Second Phase of the Kampala Infrastructure and Institutional Development Project : environmental and social impact assessment (英文)
更多显示
2016年2月1日 SFG1757 环境评价