文件与报告库

搜索/浏览文档


  

完善由:

具体日期范围

更多显示
更多显示
更多显示
  • 显示11499个结果中的第1 - 20个
  • 按批显示结果
  • 10
  • 20
  • 50
下载到Excel [x]
Pakistan - Indus Ecoregion Community Livelihood Project : environmental assessment : Environmental and social management framework (英文)

The Indus Ecoregion Community Livelihood Project for Pakistan is aimed to improve the livelihoods of the local communities by: (i) linking farmers to markets and Strengthening Value Chains (ii) facilitating Rural Non-Farm Income; and (iii) reducing risk, vulnerability, and gender inequality. ... 更多显示

环境评价 E4833 2015年5月15日

Georgia - East-West Highway Corridor Improvement Project : environmental and social impact assessment (英文)

The development objective of the East-West Highway Corridor Improvement Project for Georgia is to facilitate access of rural populations within the program area to public services, logistics corridors, and employment opportunities through the improvement of rural road infrastructure and strengthening of the decentralized road management. ... 更多显示

环境评价 SFG1019 2015年5月14日

India – Support to drinking water security pilots in India (英文)

The drinking water security pilot was launched by the Ministry of Drinking Water and Sanitation to address the emerging challenges of rapidly depleting groundwater, increased geo-genic and anthropogenic contamination and rapid system degradation from poor operation and maintenance practices, threating the sustainability of access. ... 更多显示

报告 ACS13318 2015年5月12日

Kumar,Manish

A shared vision for the Cutzamala system : a model basin in water management (英文)

The Cutzamala system is a complex inter-basin transfer built in three stages, from the late 1970s to 1994, to supply water from the Cutzamala River to the Mexico City metropolitan area (MCMA) and to the Valley of Toluca metropolitan area. ... 更多显示

工作文件 96496 2015年5月11日

Canez, Fernando Gonzalez; De Nys,Erwin; Poveda,Renan Alberto; Martinez, Caludia L. Hernandez; Contijoch Escontria,Manuel; Funes,Everest Santiago; Villanueva Moreno,Jose Arturo

Panama - Water Supply and Sanitation in Low-Income Communities Project (英文)

Ratings for the Water Supply and Sanitation in Low-Income Communities Project for Panama were as follows: outcomes were moderately satisfactory, risk to development outcome was moderate, Bank performance was moderately satisfactory, and Borrower performance was moderately satisfactory. ... 更多显示

完成执行与成果报告 ICR3382 2015年5月11日

Haiti - Sustainable Rural and Small Towns Water and Sanitation Project (英文)

The Sustainable Rural and Small Towns Water and Sanitation Project for Haiti will: i) increase access to improved water supply and sanitation in targeted rural areas and small towns in zones affected by cholera; ii) strengthen water and sanitation service delivery mechanism at the deconcentrated level; and iii) improve capacity to respond promptly and effectively to an Eligible Emergency. ... 更多显示

项目评估文件 PAD1060 2015年5月7日

Egypt, Arab Republic of - Households Natural Gas Connection Project : procurement plan of goods (英文)

采购计划 96267 2015年5月4日

Strengthen urban policy and institutions and streamline sector investment for improved service delivery in Pakistan (英文)

This synthesis report details the process, outputs and intermediate outcomes of the above technical assistance (TA) which was aimed at service delivery improvement in urban water and sanitation, especially to the urban poor, by: (i) supporting the government in establishing efficient, autonomous and responsive utility in Peshawar; (ii) facilitating the provincial/regional governments in formulation of water sector policies; (iii) designing demand based ‘Pakistan water sector technical advisory program’ for clients; and (iv) strengthening and aligning the urban (water) reform agenda in three provincial urban units through national urban forum. ... 更多显示

工作文件 ACS12930 2015年5月1日

Africa - Great Lakes Emergency Sexual and Gender Based Violence and Women’s Health Project : environmental and social management approach (英文)

The development objectives of the Great Lakes Emergency Sexual and Gender Based Violence (SGBV) and Women’s Health Project for Africa are to: (i) expand the provision of services to mitigate the short and medium term impact of SGBV, and (ii) expand utilization of a package of health and nutrition interventions targeted to poor and vulnerable females. ... 更多显示

环境评价 SFG1006 2015年5月1日

Water and wastewater services in the Danube region : a state of the sector (英文)

This report analyzes the progress and challenges of 16 countries in the Danube watershed in delivering sustainable water and wastewater services to all, while meeting the European Union environmental acquis communautaire. ... 更多显示

工作文件 96396 2015年5月1日

Gabric,Stjepan; Hommann,Kirsten; Shegay,Anastasia; Klien,Michael; Salvetti,Maria Silvia Giovanna; Sauer,Petra

Bangladesh - River Management Improvement Program Project : environmental assessment (Vol. 2) : Annexes (英文)

The development objective of the River Management Improvement Program Project for Bangladesh is to reduce the adverse impacts of flooding and erosion along the Brahmaputra right embankment, enhance its sustainable management, and improve accessibility in rural areas. ... 更多显示

环境评价 SFG1027 2015年5月1日

Monitoring country progress in drinking water and sanitation (MAPAS) : regional synthesis - Central America and Dominican Republic (英文)

The results of analysis and sector dialogue, developed during the implementation of the monitoring country progress on drinking water and sanitation (MAPAS) regional initiative, indicate that it is essential to complete the process of legal and institutional reform underway and focus on improving effective functioning of the institutions that make up the water and sanitation sector in the Central America and Dominican Republic forum for drinking water and sanitation (FOCARD-APS) member countries. ... 更多显示

UNDP-Water Sanitation Program 96506 2015年5月1日

Bangladesh - River Management Improvement Program Project : environmental assessment : Environmental impact assessment : main report (英文)

The development objective of the River Management Improvement Program Project for Bangladesh is to reduce the adverse impacts of flooding and erosion along the Brahmaputra right embankment, enhance its sustainable management, and improve accessibility in rural areas. ... 更多显示

环境评价 SFG1027 2015年5月1日

Africa - Volta River Basin Strategic Action Program Implementation Project (英文)

The project development objective for Africa Volta River Basin Strategic Action Program Implementation Project is to improve the capacity of the VBA for trans-boundary water resources management. ... 更多显示

项目评估文件 PAD1287 2015年4月30日

Supporting impact evaluation studies in water supply and sanitation in India (英文)

This synthesis report details the process, outputs and intermediate outcomes Technical Assistance (TA) ‘supporting impact evaluation studies in water supply and sanitation in India (P144956)’ implemented by the World Bank’s Water and Sanitation Program (WSP). ... 更多显示

工作文件 ACS13257 2015年4月28日

India : piloting and operationalization of city sanitation plans towards outcome oriented sector investments (英文)

This synthesis report details the process, outputs and intermediate outcomes of the World Bank’s Water and Sanitation Program (WSP) Technical Assistance (TA) to pilot and operationalize city sanitation plans (CSPs) towards outcome oriented sector investments (P131967). ... 更多显示

工作文件 ACS13273 2015年4月28日

India - Support to Government of India for Implementation of National Urban Sanitation Policy (英文)

This synthesis report details the process, outputs and intermediate outcomes of the World Bank’s Water and Sanitation Program (WSP) Technical Assistance (TA) to Support Government of India for implementation of the National Urban Sanitation Policy (P131963). ... 更多显示

工作文件 ACS13264 2015年4月28日

Kyrgyz Republic - Second Rural Water Supply and Sanitation Project (英文)

The Second Rural Water Supply and Sanitation Project for the Kyrgyz Republic received a moderately satisfactory outcome rating with substantial risk to development outcome. ... 更多显示

完成执行与成果报告 ICR3289 2015年4月27日

East Asia and Pacific - Wastewater to energy processes : a technical note for utility managers in EAP countries (英文)

The study is divided into three main sections. Section one presents the results of a comprehensive desk review describing the problem of utilities dealing with high operation costs in wastewater treatment plants, the link between energy consumption and the type of technology used for treatment, and the potential for energy generation. ... 更多显示

报告 ACS13221 2015年4月23日

Ignacio,Demilour Reyes

标题 文件日期 报告编号 文件类型 其他文种
Pakistan - Indus Ecoregion Community Livelihood Project : environmental assessment : Environmental and social management framework (英文)
更多显示
2015年5月15日 E4833 环境评价
Georgia - East-West Highway Corridor Improvement Project : environmental and social impact assessment (英文)
更多显示
2015年5月14日 SFG1019 环境评价
India – Support to drinking water security pilots in India (英文)
更多显示
2015年5月12日 ACS13318 报告
A shared vision for the Cutzamala system : a model basin in water management (英文)
更多显示
2015年5月11日 96496 工作文件
Panama - Water Supply and Sanitation in Low-Income Communities Project (英文)
更多显示
2015年5月11日 ICR3382 完成执行与成果报告
Vietnam - Mekong delta water Resources Management for Rural Development Project : procurement plan : goods and works for Baclieu Water Supply System subproject (英文)
更多显示
2015年5月7日 96400 采购计划
Haiti - Sustainable Rural and Small Towns Water and Sanitation Project (英文)
更多显示
2015年5月7日 PAD1060 项目评估文件
Egypt, Arab Republic of - Households Natural Gas Connection Project : procurement plan of goods (英文)
更多显示
2015年5月4日 96267 采购计划
Strengthen urban policy and institutions and streamline sector investment for improved service delivery in Pakistan (英文)
更多显示
2015年5月1日 ACS12930 工作文件
Africa - Great Lakes Emergency Sexual and Gender Based Violence and Women’s Health Project : environmental and social management approach (英文)
更多显示
2015年5月1日 SFG1006 环境评价
Water and wastewater services in the Danube region : a state of the sector (英文)
更多显示
2015年5月1日 96396 工作文件
Bangladesh - River Management Improvement Program Project : environmental assessment (Vol. 2) : Annexes (英文)
更多显示
2015年5月1日 SFG1027 环境评价
Monitoring country progress in drinking water and sanitation (MAPAS) : regional synthesis - Central America and Dominican Republic (英文)
更多显示
2015年5月1日 96506 UNDP-Water Sanitation Program
Bangladesh - River Management Improvement Program Project : environmental assessment : Environmental impact assessment : main report (英文)
更多显示
2015年5月1日 SFG1027 环境评价
Africa - Volta River Basin Strategic Action Program Implementation Project (英文)
更多显示
2015年4月30日 PAD1287 项目评估文件
Supporting impact evaluation studies in water supply and sanitation in India (英文)
更多显示
2015年4月28日 ACS13257 工作文件
India : piloting and operationalization of city sanitation plans towards outcome oriented sector investments (英文)
更多显示
2015年4月28日 ACS13273 工作文件
India - Support to Government of India for Implementation of National Urban Sanitation Policy (英文)
更多显示
2015年4月28日 ACS13264 工作文件
Kyrgyz Republic - Second Rural Water Supply and Sanitation Project (英文)
更多显示
2015年4月27日 ICR3289 完成执行与成果报告
East Asia and Pacific - Wastewater to energy processes : a technical note for utility managers in EAP countries (英文)
更多显示
2015年4月23日 ACS13221 报告