文件与报告库

Mauritania - Banda Gas-to-Power Guarantee Operation Project : environmental assessment (Vol. 5) (法语)

摘要

The objective of the Banda Gas-to-Power Guarantee Operation Project for Mauritania is to involve the drilling and installation of two gas production wells, and their connection to an onshore gas processing facility, via a sub-sea pipeline. Negative impacts... 更多显示

详细

  • 2014/02/01 00:00:00
  • 环境评价
  • E4276
  • 5
  • 6 (参阅所有文档系列)
  • 马里毛里塔尼亚塞内加尔
  • 非洲
  • 2014/03/03 23:00:00
  • Disclosed
  • Mauritania - Banda Gas-to-Power Guarantee Operation Project : environmental assessment
更多显示

下载

法语全部报告

正式文件版本(可能有签字)