Vietnam - Rural Distribution Project : resettlement plan (Vol. 7) : Rural distribution subproject : Xuan Loc - Cam My 110 kv transmission line and substation (英语)

摘要

The development objective of the Rural Distribution Project for Vietnam focuses on rehabilitating and increasing the capacity of existing distribution lines and substations and standardizing them to enable them to meet the growing demand more efficiently... 更多显示

详细

  • No. 1 Power Construction Consultancy Co. Ltd.; PC2 Power Engineering and Consulting Center;
  • 2007/09/25
  • 移民计划
  • RP606
  • 7
  • 67 (参阅所有文档系列)
  • 越南
  • 东亚与太平洋
  • 2007/11/20
  • Disclosed
  • Rural distribution subproject : Xuan Loc - Cam My 110 kv transmission line and substation